{"id":10308,"date":"2019-12-18T11:14:52","date_gmt":"2019-12-18T10:14:52","guid":{"rendered":"https:\/\/www.concrete-solutions.eu\/rotop-power-fuer-marina-tower\/"},"modified":"2022-05-07T06:39:53","modified_gmt":"2022-05-07T04:39:53","slug":"rotop-power-fuer-marina-tower","status":"publish","type":"post","link":"https:\/\/www.concrete-solutions.eu\/en\/rotop-power-fuer-marina-tower\/","title":{"rendered":"Rotop\u00ae Power for Vienna&#8217;s Marina Tower"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row][vc_column][vc_column_text]Spun concrete from the &#8220;extra strong&#8221; category was used to support the planned 39-storey residential tower over the coming months on a total of 84 Rotop\u00ae supports! Or to put it another way: a total of 500 residential units will soon be supported by the Rotop\u00ae columns on the lower floors, where the shopping and gastronomy areas as well as a medical centre and a kindergarten are being built to complement the exclusive living pleasure. The whole thing under the marketing motto &#8220;A fulfilled life&#8221; &#8230;<\/p>\n<p><strong>Incredible 32,000 kN superimposed load per column<\/strong><\/p>\n<p>The Rotop\u00ae props used for this project are also &#8220;full to bursting&#8221;. It is well known that some of the five to six thousand Rotop\u00ae props that leave the MABA factory in Micheldorf every year are true performance monsters. But every now and then there are orders where the limits of what is feasible are once again pushed a little higher: The approx. 13-metre-long Rotop\u00ae props produced for the Marina Tower at Vienna&#8217;s Handelskai with a diameter of 70+80 cm are designed to lift the weight of 3,200 medium-sized cars. This means that only four such supports could easily carry the entire Eiffel Tower &#8211; visitors included!<\/p>\n<p>Each of the 18-tonne columns contains a 6-tonne reinforcement construction, which our highly qualified and certified specialists welded together professionally and meticulously. The resulting 16% degree of reinforcement is also unique in the whole country and may only be implemented in Austria by MABA Fertigteilindustrie with its corresponding qualifications and specific quality assurance.<\/p>\n<p><strong>Unusual installation<\/strong><\/p>\n<p>The fact that the columns, delivered by special transports, are often installed in Vienna at night and in fog has not only to do with the weather, but above all with the traffic situation in the capital. Rather unusual, on the other hand, was the fact that the columns were threaded from high above through the recesses in the already constructed floor slab using an extra-high crane. This saved the erectors the considerable costs that would otherwise have been necessary for months of renting heavy-duty uprights. The installation was therefore an appropriately spectacular and elegant ballet in yellow and blue, for which the two leading special logistics companies and crane operators arrived with their heaviest equipment. However, the massive supports from Micheldorf played the leading role on this evening. Interested passers-by may want to take a closer look at the structure in the coming weeks and months before the pressure load monsters disappear behind the smart fa\u00e7ade of Vienna&#8217;s lighthouse project.[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column col_padding_top=&#8221;30&#8243;][vc_single_image image=&#8221;7406&#8243; img_size=&#8221;720&#215;480&#8243;][\/vc_column][\/vc_row][vc_row][vc_column col_padding_top=&#8221;30&#8243;][vc_single_image image=&#8221;7266&#8243; img_size=&#8221;720&#8243;][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text]Copyright Bilder: \u00a9 SchoberArts[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][vc_column_text]Spun concrete from the &#8220;extra strong&#8221; category was used to support the planned 39-storey residential tower over the coming months on a total of 84 Rotop\u00ae supports! Or to put it another way: a total of 500 residential units will&hellip;<\/p>\n","protected":false},"author":2,"featured_media":7276,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"tags":[],"class_list":["post-10308","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rotop\u00ae Power for Vienna&#039;s Marina Tower - Kirchdorfer Concrete Solutions<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.concrete-solutions.eu\/en\/rotop-power-fuer-marina-tower\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rotop\u00ae Power for Vienna&#039;s Marina Tower - Kirchdorfer Concrete Solutions\" \/>\n<meta property=\"og:description\" content=\"[vc_row][vc_column][vc_column_text]Spun concrete from the &#8220;extra strong&#8221; category was used to support the planned 39-storey residential tower over the coming months on a total of 84 Rotop\u00ae supports! Or to put it another way: a total of 500 residential units will&hellip;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.concrete-solutions.eu\/en\/rotop-power-fuer-marina-tower\/\" \/>\n<meta property=\"og:site_name\" content=\"Kirchdorfer Concrete Solutions\" \/>\n<meta property=\"article:published_time\" content=\"2019-12-18T10:14:52+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-05-07T04:39:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.concrete-solutions.eu\/wp-content\/uploads\/2019\/12\/Baustellentagebuch_01.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1280\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Sonja Lach\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Sonja Lach\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/en\\\/rotop-power-fuer-marina-tower\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/en\\\/rotop-power-fuer-marina-tower\\\/\"},\"author\":{\"name\":\"Sonja Lach\",\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/#\\\/schema\\\/person\\\/c4b058cd255173729fbaf7ddedcad1de\"},\"headline\":\"Rotop\u00ae Power for Vienna&#8217;s Marina Tower\",\"datePublished\":\"2019-12-18T10:14:52+00:00\",\"dateModified\":\"2022-05-07T04:39:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/en\\\/rotop-power-fuer-marina-tower\\\/\"},\"wordCount\":482,\"publisher\":{\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/en\\\/rotop-power-fuer-marina-tower\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/wp-content\\\/uploads\\\/2019\\\/12\\\/Baustellentagebuch_01.jpg\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/en\\\/rotop-power-fuer-marina-tower\\\/\",\"url\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/en\\\/rotop-power-fuer-marina-tower\\\/\",\"name\":\"Rotop\u00ae Power for Vienna's Marina Tower - Kirchdorfer Concrete Solutions\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/en\\\/rotop-power-fuer-marina-tower\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/en\\\/rotop-power-fuer-marina-tower\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/wp-content\\\/uploads\\\/2019\\\/12\\\/Baustellentagebuch_01.jpg\",\"datePublished\":\"2019-12-18T10:14:52+00:00\",\"dateModified\":\"2022-05-07T04:39:53+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/en\\\/rotop-power-fuer-marina-tower\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.concrete-solutions.eu\\\/en\\\/rotop-power-fuer-marina-tower\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/en\\\/rotop-power-fuer-marina-tower\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/wp-content\\\/uploads\\\/2019\\\/12\\\/Baustellentagebuch_01.jpg\",\"contentUrl\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/wp-content\\\/uploads\\\/2019\\\/12\\\/Baustellentagebuch_01.jpg\",\"width\":1920,\"height\":1280,\"caption\":\"Rotop Marina Tower\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/en\\\/rotop-power-fuer-marina-tower\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Rotop\u00ae Power for Vienna&#8217;s Marina Tower\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/#website\",\"url\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/\",\"name\":\"Kirchdorfer Concrete Solutions\",\"description\":\"A world of concrete solutions\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/#organization\",\"name\":\"Kirchdorfer Concrete Solutions\",\"url\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/wp-content\\\/uploads\\\/2018\\\/11\\\/Kirchdorfer-ConSol-Logo-hoch-RGB.jpg\",\"contentUrl\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/wp-content\\\/uploads\\\/2018\\\/11\\\/Kirchdorfer-ConSol-Logo-hoch-RGB.jpg\",\"width\":2262,\"height\":1284,\"caption\":\"Kirchdorfer Concrete Solutions\"},\"image\":{\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/#\\\/schema\\\/person\\\/c4b058cd255173729fbaf7ddedcad1de\",\"name\":\"Sonja Lach\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/aafd68ebcdf88052af31185e4b833b5262588cb9ead9e4e743a105788c4cfc86?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/aafd68ebcdf88052af31185e4b833b5262588cb9ead9e4e743a105788c4cfc86?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/aafd68ebcdf88052af31185e4b833b5262588cb9ead9e4e743a105788c4cfc86?s=96&d=mm&r=g\",\"caption\":\"Sonja Lach\"},\"url\":\"https:\\\/\\\/www.concrete-solutions.eu\\\/en\\\/author\\\/sonja-lach\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rotop\u00ae Power for Vienna's Marina Tower - Kirchdorfer Concrete Solutions","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.concrete-solutions.eu\/en\/rotop-power-fuer-marina-tower\/","og_locale":"en_US","og_type":"article","og_title":"Rotop\u00ae Power for Vienna's Marina Tower - Kirchdorfer Concrete Solutions","og_description":"[vc_row][vc_column][vc_column_text]Spun concrete from the &#8220;extra strong&#8221; category was used to support the planned 39-storey residential tower over the coming months on a total of 84 Rotop\u00ae supports! Or to put it another way: a total of 500 residential units will&hellip;","og_url":"https:\/\/www.concrete-solutions.eu\/en\/rotop-power-fuer-marina-tower\/","og_site_name":"Kirchdorfer Concrete Solutions","article_published_time":"2019-12-18T10:14:52+00:00","article_modified_time":"2022-05-07T04:39:53+00:00","og_image":[{"width":1920,"height":1280,"url":"https:\/\/www.concrete-solutions.eu\/wp-content\/uploads\/2019\/12\/Baustellentagebuch_01.jpg","type":"image\/jpeg"}],"author":"Sonja Lach","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Sonja Lach","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.concrete-solutions.eu\/en\/rotop-power-fuer-marina-tower\/#article","isPartOf":{"@id":"https:\/\/www.concrete-solutions.eu\/en\/rotop-power-fuer-marina-tower\/"},"author":{"name":"Sonja Lach","@id":"https:\/\/www.concrete-solutions.eu\/#\/schema\/person\/c4b058cd255173729fbaf7ddedcad1de"},"headline":"Rotop\u00ae Power for Vienna&#8217;s Marina Tower","datePublished":"2019-12-18T10:14:52+00:00","dateModified":"2022-05-07T04:39:53+00:00","mainEntityOfPage":{"@id":"https:\/\/www.concrete-solutions.eu\/en\/rotop-power-fuer-marina-tower\/"},"wordCount":482,"publisher":{"@id":"https:\/\/www.concrete-solutions.eu\/#organization"},"image":{"@id":"https:\/\/www.concrete-solutions.eu\/en\/rotop-power-fuer-marina-tower\/#primaryimage"},"thumbnailUrl":"https:\/\/www.concrete-solutions.eu\/wp-content\/uploads\/2019\/12\/Baustellentagebuch_01.jpg","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.concrete-solutions.eu\/en\/rotop-power-fuer-marina-tower\/","url":"https:\/\/www.concrete-solutions.eu\/en\/rotop-power-fuer-marina-tower\/","name":"Rotop\u00ae Power for Vienna's Marina Tower - Kirchdorfer Concrete Solutions","isPartOf":{"@id":"https:\/\/www.concrete-solutions.eu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.concrete-solutions.eu\/en\/rotop-power-fuer-marina-tower\/#primaryimage"},"image":{"@id":"https:\/\/www.concrete-solutions.eu\/en\/rotop-power-fuer-marina-tower\/#primaryimage"},"thumbnailUrl":"https:\/\/www.concrete-solutions.eu\/wp-content\/uploads\/2019\/12\/Baustellentagebuch_01.jpg","datePublished":"2019-12-18T10:14:52+00:00","dateModified":"2022-05-07T04:39:53+00:00","breadcrumb":{"@id":"https:\/\/www.concrete-solutions.eu\/en\/rotop-power-fuer-marina-tower\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.concrete-solutions.eu\/en\/rotop-power-fuer-marina-tower\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.concrete-solutions.eu\/en\/rotop-power-fuer-marina-tower\/#primaryimage","url":"https:\/\/www.concrete-solutions.eu\/wp-content\/uploads\/2019\/12\/Baustellentagebuch_01.jpg","contentUrl":"https:\/\/www.concrete-solutions.eu\/wp-content\/uploads\/2019\/12\/Baustellentagebuch_01.jpg","width":1920,"height":1280,"caption":"Rotop Marina Tower"},{"@type":"BreadcrumbList","@id":"https:\/\/www.concrete-solutions.eu\/en\/rotop-power-fuer-marina-tower\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/www.concrete-solutions.eu\/en\/"},{"@type":"ListItem","position":2,"name":"Rotop\u00ae Power for Vienna&#8217;s Marina Tower"}]},{"@type":"WebSite","@id":"https:\/\/www.concrete-solutions.eu\/#website","url":"https:\/\/www.concrete-solutions.eu\/","name":"Kirchdorfer Concrete Solutions","description":"A world of concrete solutions","publisher":{"@id":"https:\/\/www.concrete-solutions.eu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.concrete-solutions.eu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.concrete-solutions.eu\/#organization","name":"Kirchdorfer Concrete Solutions","url":"https:\/\/www.concrete-solutions.eu\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.concrete-solutions.eu\/#\/schema\/logo\/image\/","url":"https:\/\/www.concrete-solutions.eu\/wp-content\/uploads\/2018\/11\/Kirchdorfer-ConSol-Logo-hoch-RGB.jpg","contentUrl":"https:\/\/www.concrete-solutions.eu\/wp-content\/uploads\/2018\/11\/Kirchdorfer-ConSol-Logo-hoch-RGB.jpg","width":2262,"height":1284,"caption":"Kirchdorfer Concrete Solutions"},"image":{"@id":"https:\/\/www.concrete-solutions.eu\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.concrete-solutions.eu\/#\/schema\/person\/c4b058cd255173729fbaf7ddedcad1de","name":"Sonja Lach","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/aafd68ebcdf88052af31185e4b833b5262588cb9ead9e4e743a105788c4cfc86?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/aafd68ebcdf88052af31185e4b833b5262588cb9ead9e4e743a105788c4cfc86?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/aafd68ebcdf88052af31185e4b833b5262588cb9ead9e4e743a105788c4cfc86?s=96&d=mm&r=g","caption":"Sonja Lach"},"url":"https:\/\/www.concrete-solutions.eu\/en\/author\/sonja-lach\/"}]}},"_links":{"self":[{"href":"https:\/\/www.concrete-solutions.eu\/en\/wp-json\/wp\/v2\/posts\/10308","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.concrete-solutions.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.concrete-solutions.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.concrete-solutions.eu\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.concrete-solutions.eu\/en\/wp-json\/wp\/v2\/comments?post=10308"}],"version-history":[{"count":2,"href":"https:\/\/www.concrete-solutions.eu\/en\/wp-json\/wp\/v2\/posts\/10308\/revisions"}],"predecessor-version":[{"id":10310,"href":"https:\/\/www.concrete-solutions.eu\/en\/wp-json\/wp\/v2\/posts\/10308\/revisions\/10310"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.concrete-solutions.eu\/en\/wp-json\/wp\/v2\/media\/7276"}],"wp:attachment":[{"href":"https:\/\/www.concrete-solutions.eu\/en\/wp-json\/wp\/v2\/media?parent=10308"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.concrete-solutions.eu\/en\/wp-json\/wp\/v2\/tags?post=10308"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}